Moss Plastics, Oxfordshire
 
The design and build project was for the construction of a specialist store facility to house expensive tooling at Moss Plastics' main manufacturing site.
The project was unusual in that it required the store to be fire proofed with a four hour fire integrity rating. The store contains 350 sq m of pre-fabricated concrete columns and a concrete slab designed to take high loadings from racking.
The precast concrete sections were manufactured ‘in-house' by Faircloth's subsidiary company Atcost. Atcost's concrete is tough, highly durable and fire and corrosion resistant making it ideal for the design brief.

"We have an on-going business relationship with Faircloth and we will certainly continue to use them again in the future."
Maurice Callan, Moss Plastics.

Client - Moss Plastics
Architect - Bozeat Partnership
Engineer - Granville & Company
Duration - 20 weeks