Pool House London
Client - Private. Duration - 16 weeks. This dramatic oak framed structure included a kitchenette, shower room, barbecue area and plant room. The building has exposed rafters, dark stained weatherboarding, a plain clay tiled roof, and was complemented with a York stone paved patio outside. All the joinery...
The Maze Restaurant, London
Architects - Blair Associates. Duration - 24 weeks. Designed by renowned architect David Rockwell, this project was a multi-million pound addition to Gordon Ramsay's restaurant group. The expert team of construction specialists had to carry out the work without disturbing guests staying in the surrounding...
Marriott Hotel, London
"Faircloth have been professional from the start. They have been timely in execution and flexible enough to work hand-in-hand with ourselves. I can't praise them enough for their ability to cope with things that had not gone to plan." Hugh Hodgins, The Marriott This project was part of...
Glass Topped Roof Extension, London
Architects - Blair Associates. Duration - 12 weeks. This award winning project involved the construction of a steel work roof for a glass topped extension. Located in a busy part of the capital the build required the expert use of a crane throughout. The design strategy required a structural frame with a...