MARKET SECTORS - INDUSTRIAL

Moss Plastics

Client - Moss Plastics.
Duration - 20 weeks.

"We have an on-going business relationship with Faircloth and we will certainly continue to use them again in the future."
Maurice Callan, Moss Plastics.

The design and build project was for the construction of a specialist store facility to house expensive tooling at Moss Plastics' main manufacturing site.  The project was unusual in that it required the store to be fire proofed with a four hour fire integrity rating. The store contains 350 sq m of pre-fabricated concrete columns and a concrete slab designed to take high loadings from racking. The precast concrete sections were manufactured ‘in-house' by Faircloth's subsidiary company Atcost. Atcost's concrete is tough, highly durable and fire and corrosion resistant making it ideal for the design brief.