MARKET SECTORS - SPECIALIST

Glass Topped Roof Extension, London

Architects - Blair Associates.
Duration - 12 weeks.

This award winning project involved the construction of a steel work roof for a glass topped extension. Located in a busy part of the capital the build required the expert use of a crane throughout. The design strategy required a structural frame with a freestanding glass skin, allowing the roof pavilion to float above the building. All the components had to be small enough to be lifted to the top of the building for assembly.