MARKET SECTORS

Commercial

Client - Teesland IDG. Architect - Hamiltons Architects Ltd. Project Management - Rex Proctor & Partners. Duration - 32 weeks. Value - £1.4m "Faircloth worked really hard to produce a crisp, nicely detailed building which is sympathetic to other buildings on the site."...

Woolwich, London

Duration - 36 weeks. The project involved the construction of the striking Hospital Lane Dental Practice, which included attractive bull nose fascia, a steel frame and an aluminum curved roof.

Dental Surgery, Kent

Project Management - GVA Second London Wall & Gleeds. Duration - 24 weeks. "Faircloth are a new contractor to us and we've had no problems - they performed well and we would therefore use them again." Richard Hine, Gleeds This build saw the completion of retail units...

Edmunson Electrical, Gillingham

Industrial

Client - Greater London Enterprises (GLE). Architect - West & Partner. Project Management - P2M. Duration - 28 weeks. Value - £3.5 m "I enjoyed working with Faircloth. The quality of the finishes and general workmanship was very impressive." Peter Long, West &...

Riverwalk, Enfield

Client - Meryl Lynch Investments. Project Management - GVA Second London Wall. Duration - 24 weeks.  "Faircloth were a pleasure to work with. They won the tender because they offered the best commercial package which we considered to be value for money." Neil Walters, GVA Second...

Park Royal, London

Client - Moss Plastics. Duration - 20 weeks. "We have an on-going business relationship with Faircloth and we will certainly continue to use them again in the future." Maurice Callan, Moss Plastics. The design and build project was for the construction of a specialist store facility to house expensive...

Moss Plastics

Retail

Client - Goodman. Architect - McDonald Architects. Duration - 18 weeks. "The end result is a much more attractive shop with a more effective use of space. We were really delighted with the finished building." McDonald Architects. The Retail store was completely gutted by...

Retail Store, Newbury

Client - Builder Depot. Architects - RGP Architects. Duration - 48 weeks. Value - £5m "We have used Faircloth's services on numerous occasions and they have always done an excellent job. This site has set a new industry standard." Adam Webster, Builder Depot. This...

Builder Depot

Carpet Right - Romford, Essex  Project Manager - Concept Project Management Services. The Carpet Right in Romford involved the demolition of an existing building, retaining the existing ground floor slab and the design and build of a new 1,200 sq m retail unit. Carpet Right...

Carpet Right

Structural Engineer - Clark Smith Partnership Duration - 26 weeks. "Faircloth are a great company to work with and their customer care is excellent, with quality craftsmen doing a good job." Eddie Andrews, Andrews Office Furniture  The brief was to design...

Andrews Office Furniture, North London

Leisure

Client - Motorsport Vision. Architect - McDonald Architects. Duration - 24 weeks. This project involved the construction of the pit complex at Oulton Park with facilities including new garages, a control building over three floors, and a commentator's podium. The work involved the demolition of the...

Oulton Park Pit Complex, Cheshire

Client - Motorsport Vision. Duration - 15 weeks. The project required the construction of a WC pod and terrace area overlooking the start line at Brands Hatch. The work involved the demolition of the existing building and a re-design of the foundations, which had to avoid underground services. The result...

Brands Hatch, Kent

Client - Motorsport Vision. Architect - McDonald Architects. Duration - 18 weeks. The construction of the Chequered Flag restaurant incorporated a steel frame which allowed for speed of construction and for one elevation to be fully glazed for viewing purposes. Internally the building included a fully...

Oulton Park, Restaurant and Circuit, Cheshire

Client - Octagon Motorsport. Architect - McDonald Architects. Value - £4m This contract included various constructions and upgrades across the site in preparation for the Formula 1 Grand Prix. Pictured is the new police command and control centre at the circuit. The steel framed building features flat vertical cladding, a glazed...

Silverstone, Northamptonshire

Bridges

Client - Octagon Motorsport. Architect - McDonald Architects. The Silverstone circuit appointed Faircloth to design, manufacture and construct a highway specification bridge over its circuit. The bridge which was 40 metres in span was steel framed and had a metal deck, with concrete insitu...

Silverstone, Northamptonshire

Client - Brands Hatch Leisure Group. The project involved the construction of a new pedestrian footbridge over the racing circuit at Brands Hatch. The New Druids Bridge was designed and manufactured in the Faircloth workshop. The brief was to work to a tight deadline, with two months to design,...

Brands Hatch, Kent

Architects - Blair Associates.   The bridge at computer associates was one part of the project which also involved converting the South Gate House and building a new extension to provide an auditorium.  The project involved the design and build of the 27-metre span vehicle and pedestrian bridge...

Computer Associates, Datchet

Specialist

Client - Private. Duration - 16 weeks. This dramatic oak framed structure included a kitchenette, shower room, barbecue area and plant room. The building has exposed rafters, dark stained weatherboarding, a plain clay tiled roof, and was complemented with a York stone paved patio outside. All the joinery...

Pool House London

Architects - Blair Associates. Duration - 24 weeks. Designed by renowned architect David Rockwell, this project was a multi-million pound addition to Gordon Ramsay's restaurant group. The expert team of construction specialists had to carry out the work without disturbing guests staying in the surrounding...

The Maze Restaurant, London

"Faircloth have been professional from the start. They have been timely in execution and flexible enough to work hand-in-hand with ourselves. I can't praise them enough for their ability to cope with things that had not gone to plan." Hugh Hodgins, The Marriott This project was part of...

Marriott Hotel, London

Architects - Blair Associates. Duration - 12 weeks. This award winning project involved the construction of a steel work roof for a glass topped extension. Located in a busy part of the capital the build required the expert use of a crane throughout. The design strategy required a structural frame with a...

Glass Topped Roof Extension, London